           According  to  the  construction  plan , the  production  and  processing  of  the  light  mining  plate  and  steel  structure  can  be  arranged  in  advance  according  to  the  requirements  of  the  drawings .

          1、When  loading  and  unloading  of  the  mining  plate , the  surface  of  the  mining  plate  should  be  avoided  due  to  contact  with  external  hard  objects  or  friction  caused   by  dragging .

          2、Loading  and  unloading  every  2-3  meters  a  person , hands  hold  both  sides  of  the  mining  plates , to  avoid  breaking  the  mining  plate , not  drag , so  as  not  to  wear , scratch  the  board .

          3、When  hoisting  the  crane , at  least  the  above  3  fixed  points  can  be  fixed  to  lift , so  as  to  prevent  the  mining   plate  from  breaking .

          4、The  lighting  plate  should  be  stored  in  a  dry  place , and  it  is  strictly  prohibited  to  store  it  outdoors  without  protective  measures . It  is  strictly  prohibited  to  be  exposed  to  the  sun  and  rain , especially  after  the  rain .

          5、Obvious  marks  should  be  set  around  the  plate  stack , so  as  not  to  damage  the  plate  by  external  factors . Heavy  pressure  and  trampling  are  strictly  prohibited .

          Lighting  plate  installation  and  construction  precautions .

          1、The  light  plate  should  be  drilled  before  setting .

          2、The  longitudinal  lap  length  of  the  light  mining  plate  shall  be  greater  than  or  equal  to  250mm .Two  butly  waterproof  tapes  shall  be  affixed  to  the  lap  part  and  fixed  with  reinforcing  straps .

          3、When  the  lighting  plate  is  fixed , in  order  to  enhance  the  waterproof  and  dustproof  and  wind  pressure  resistance  of  the  lighting  plate ,EPDM  waterproof  washer  or  saddle  pad  should  be  added  between  the  tapping  nail  and  the  lighting  plate .

          4、The  joint  between  the  vertical  lock  seam  light  plate  and  the  roof  color  steel  plate  or  light  plate  and  light  plate  should  be  fixed  with  a  strengthening  strap  to  ensure  the  waterproof  and  dustproof  effect  of  the  joint .