When installing FRP lighting panels, pay attention to the following points:
1. The roof is nailed at the crest, and the side wall is nailed at the trough;
2. Lap length:
A. The length of the roof lap depends on the slope of the roof. In principle, it should not exceed 400m and the lap joint should be sealed with double butyl tape if the slope is too small;
B. The lap length of the side wall is 50-150m
3. The staple distance in the sliver direction shall not be greater than 600m;
4. Do not use too much force when nailing. It is recommended to add waterproof gaskets when nailing;
5. Use butyl sealing tape at the lap joint of the lighting board;
6. It is strictly forbidden to step on the lighting board during installation.